Publikationen der Stiftung → Effective operation assessment of more than 25 years old and newly built hydro power plants Titel
Publikationen der Stiftung → Effective operation assessment of more than 25 years old and newly built hydro power plants
Titel
Titelaufnahme
Titelaufnahme
- TitelEffective operation assessment of more than 25 years old and newly built hydro power plants
- Verfasser
- Körperschaft
- Erschienen
- Parallele Sprachausgabe
- Umfang1 Online-Ressource (44 Seiten) : Illustrationen
- SpracheEnglisch
- DokumenttypDruckschrift
- Schlagwörter
- Geografika
- URN
Links
- Nachweis
- Archiv
Dateien
Klassifikation
Zusammenfassung
The World faces serious environmental challenges, that is caused by the human activities and climate change. Amount of the natural disasters have been significantly increased during last decade. Eventually all above-listed affected Georgia as well.
Georgia aims to achieve long-term safety in energy sector, but country still depends on imported resources and fossil fuel. Lack of renewable energy use and energy resource exploitation is still a problem.
Meanwhile, in energy sector, during last six years, Georgia had average 5% increase in power consumption, it particularly increased up to 7% in last two years. The figures are quite alarming.
Based on the above-mentioned it is obvious, that increase of national generation sources is essential.
One of the ways for problem solution is to modernize and renovate old HPP park, that with less financial expenses and shorter period will increase the exploitation level and indicator. Researches on six HPPs, showed that detailed technical audit must be conducted on power plants condition assessment and determine specific activities for the effective operation and maintenance of the existing plants and machines.